Product description
Cable assembly, Helios-4 inlet 1 to facility N2 pressure sensor
Specifications and identifiers
identification
| Function | Inlet/facility N2 pressure signal cable |
|---|
| Tool reference | Helios-4 |
|---|
| Endpoint reference | Inlet 1 to facility N2 pressure sensor wording appears in part references |
|---|
Applications
tool interconnectsload lock wiringgas-box or chamber subassembliesgas pressure signal wiringHelios-4 gas/facility interface servicecable assembly replacement
How it works
A harness assembly groups conductors and connectors into a defined cable set for a specific tool function.
The correct harness preserves pinout, shielding, routing length, and connector orientation; an incorrect harness can cause intermittent faults or I/O errors.
Technical guide
conductors
Typically copper conductors with insulation and connector hardware; exact construction must be verified.
What to verify before purchase
- Confirm endpoint labels and connector keying.
- Measure cable length and routing.
- Check shield/ground continuity and label condition.
Confirm with the seller
- Exact connector part numbers and cable length are not confirmed.
Product reference only. Confirm fitment, revision, included components, and specifications before purchase.